Commit Graph
2 Commits
Author SHA1 Message Date
mesalogo 5e255747ee docs(hosts): record the Hosts application first phase
Mark the host management entry migration as implemented across the PRD,
logic, UI and technical designs, and add a progress record with the
verification results and remaining gaps. Update the feature lists to point
to the new remote capability switch.
2026-10-13 08:09:20 +08:00
mesalogo 76e781a0a8 release: prepare Desktop 0.15.2 and Agent 0.15.0
Cross-platform packages / Validate source (push) Canceled after 0s
Cross-platform packages / Authorize desktop packaging (push) Canceled after 0s
Cross-platform packages / linux arm64 (push) Canceled after 0s
Cross-platform packages / macos arm64 (push) Canceled after 0s
Cross-platform packages / windows arm64 (push) Canceled after 0s
Cross-platform packages / linux x64 (push) Canceled after 0s
Cross-platform packages / macos x64 (push) Canceled after 0s
Cross-platform packages / windows x64 (push) Canceled after 0s
Cross-platform packages / Publish GitHub and OSS release (push) Canceled after 0s
GoodBuddy Agents / Validate Agent source (push) Canceled after 0s
GoodBuddy Agents / Build darwin arm64 Agent (push) Canceled after 0s
GoodBuddy Agents / Build linux arm64 Agent (push) Canceled after 0s
GoodBuddy Agents / Build linux x64 Agent (push) Canceled after 0s
Add bilingual notes for Story Graph reads, full follow-up editing, note capture, diagnostics and website updates. Preserve published 0.15.1 history and include reviewed Host/cloud plans as explicitly unimplemented documentation. Agent remains 0.15.0 and requires Desktop 0.15.2. Typecheck, lint, notes and website validation passed; current-source Host runtime checks made four real model requests. User requested full-suite validation in CI rather than waiting for the interrupted local run.
2026-09-28 12:55:10 +08:00